Food Processing Steel Structure Workshop

Shanfu Rishui food processing steel structure workshop:

 

Project Description of steel structure workshop:
 

Construction area: 16500㎡, as this workshop is used for food processing, so it has high requirement to the construction materials,construction workmanship. It is a totally closed workshop, all the corners,edges were sealed by stainless steel. High standard, high requirement to make sure the Project  be clean, resistant to corrosion, non-pollution.
 

Detail description of steel structure workshop:
 

1.Main steel structure: welded H steel;
2.Purlin: C section steel;
3.Roof panel: color steel sheet with fiberglass insulation;
4.Wall: with 1.2m brick wall ,color steel sheet with fiberglass insulation above 1.2m;
5.Tie bar: Q235B round tube;
6.Brace: round steel;
7.Lateral and column bracing: round steel;
8.Knee brace: hot- rolled angle steel;
9.Trims,flashing: color steel sheet;
10.Gutter:color steel sheet;
11.Downpipe: PVC;
12:Door: sandwich panel door;
13: Window: Alumnium window (single glass)

Installation quality control of steel structure workshop
1) before installation, the construction unit of product certification, design documents and deal with members assembled records for inspection, record the size of the component and the reinspection do not coincide.Deformation of steel structure, defects exceed the allowable deviation, should be handled.
Before the installation, should prepare a detailed measurement and correction of the process, the welding of thick steel plate shall be installed in the welding process test of simulated product structure before, prepare the corresponding construction technology.Wriggle through the earth to assemble good roof should be preset a certain degree.
(2) steel structure hoisting in place, after dealing with components such as design requirements for control point positioning axis, elevation measurement marking, for lifting the butt joint quality inspection before welding.Temporary support wave and steel cable is installed in order to make the security and stability of steel roof in construction process.
(3) the steel structure installation, the construction unit shall submit each common component after lifting the elevation dimension, welding, painting and so on were submitted to supervision of acceptance.