Pre-engineering steel structure building


 

MAIN STEEL PART of pre-engineering steel structure building

1. H section steel columns, beams and wind-proof columns
2. With treatment of one time red-oxide primer painting and two times grey facing painting

ROOF & WALL CLADDING for pre-engineering steel structure building


1. Roof & Wall Corrugated Single Steel Sheet: 0.3mm-0.6mm
2. Roof & Wall Sandwich Panel Insulated with EPS Foam, Glass wool, Rock wool and PU: 50mm-150mm
3. Transparent Sheet (FRP): 1.0mm-2.0mm
4. Flashings: Made by Color-coated Corrugated Steel Sheet

WINDOW & DOOR for pre-engineering steel structure building


1. Window: PVC Window or Aluminum-alloy Window
2. Door: Sliding Door or Roll-up Door

FASTENERS for pre-engineering steel structure building

High-strength Bolt; Common Bolt and Nut; Self-tapping Screws; Foundation Bolt and Nut, ETC

Installation control of pre-engineering steel structure building

1) before installation, the construction unit of product certification, design documents and deal with members assembled records for inspection, record the size of the component and the reinspection do not coincide.Deformation of steel structure, defects exceed the allowable deviation, should be handled.
Before the installation, should prepare a detailed measurement and correction of the process, the welding of thick steel plate shall be installed in the welding process test of simulated product structure before, prepare the corresponding construction technology.Wriggle through the earth to assemble good roof should be preset a certain degree.
(2) steel structure hoisting in place, after dealing with components such as design requirements for control point positioning axis, elevation measurement marking, for lifting the butt joint quality inspection before welding.Temporary support wave and steel cable is installed in order to make the security and stability of steel roof in construction process.

 

 